News & Events

 

See our upcoming Article in

Magazine March, 2010

NEW DISTRIBUTION INTEGRITY MANAGEMENT PROGRAM (DIMP)

REQUIREMENTS FOR GAS DISTRIBUTION PIPELINES

 

On December 4, 2009, the Department of Transportation, Pipeline and Hazardous Materials Safety Administration amended the Natural Gas Pipeline Safety Act to require operators of gas distribution pipelines to develop and implement Integrity Management (IM) programs.  The stated purpose of these programs is to enhance safety by identifying and reducing pipeline integrity risks.  The final rule took effect February 2, 2010.  Gas distribution operators must develop and implement an Integrity Management program that includes a written Integrity Management plan as specified in 49 CFR Part 192 Paragraph 192.1007 no later than August 2, 2011. The purpose of the IM program for distribution pipelines is to enhance safety by identifying and reducing pipeline integrity risk.  The rule uses a simple risk-based approach to pipeline integrity; however, obtaining all the pertinent data for development of the program may prove to be very difficult for many operators. With the development of commercially available model plans, creation of a written Distribution Integrity Management plan should not be complicated, while remaining economically feasible.  Southern Cathodic Protection is ready to assist in obtaining the data for populating these model plans.  Call us today. Together, we can make a difference in pipeline safety.

 

Southern Cathodic
Protection
offers
AC Mitigation and
Bare Pipe Analysis

 

 


Bare pipe

Statistical Corrosion Analysis
For
Pipeline Asset Management

Southern Cathodic Protection Company offers professional corrosion engineering services to perform a statistical corrosion analysis of cast iron, ductile iron and bare steel pipelines. The Southern Cathodic Protection Statistical Corrosion Probability (SCP™) and Maximum Pit
Depth (MPD ™) models calculate mean-time to corrosion failure as well as maximum pit depths of the pipeline based on the age of the pipeline and the environment. The proprietary models are powerful tools in projecting the operating life of pipelines. These projections are critical elements for asset management and capital planning.

 

 

Google
Search WWW Search www.cathodicprotection.com